Awaab's Law Phase 2: what changes on 30 November 2026
From 30 November 2026, registered providers of social housing in England must meet Awaab's Law deadlines for seven more hazard categories, not just damp, mould and emergencies.
The seven new hazard categories
Phase 2 extends the same Awaab's Law deadlines that already apply to damp and mould to the hazards below. The examples are ours, to show what a report might look like.
Excess cold
A resident reports the heating has failed and the flat is cold, with a newborn at home.
Excess heat
A top-floor flat with no way to keep cool during a heatwave, and an elderly resident.
Falls
Including falls on the level, on stairs and between levels: a loose stair rail, a broken step, a missing window restrictor.
Structural collapse
A ceiling bulging after a leak, or a balcony that's come away from the wall.
Fire and explosions
A faulty fire door in a block, or a smell of gas.
Electrical hazards
Exposed wiring, a scorched socket, or a consumer unit that keeps tripping.
Domestic hygiene
Including personal hygiene and food safety: a kitchen or bathroom that can't be used safely.
Why Phase 2 is harder than Phase 1
They don't look like repairs
Phase 1 was mostly damp and mould, which repairs teams already recognise. Phase 2 hazards often arrive as a routine-sounding job ("the heating's broken", "the stair rail's loose") and need someone to spot the hazard behind it.
They belong to different teams
Excess cold might sit with heating contractors, falls with responsive repairs, fire with building safety. Each team has its own queue, so a hazard can fall between them while the time limit runs down.
Urgency depends on your policies
The same fault can be more or less urgent depending on the circumstances. Urgency rules are set by each landlord to match their own policies.
How our platform handles Phase 2
People & Platform logs the new hazards, sorts them by urgency and assigns them to the responsible team in the same way as damp and mould, so your team doesn't need a separate process for each one.
- Residents report on WhatsApp, email or the web, and every report is logged as a case.
- People & Platform sorts each report by urgency, using rules you set, so hazards in the new categories are picked out rather than waiting in a routine repairs queue.
- People & Platform automatically assigns each case to the responsible team, using rules you set.
- Awaab's Law deadlines are tracked automatically, alongside your own service targets.
- Every message, piece of evidence and step is recorded in the case history, so you can prove you did the right thing, at the right time.
Ready for Awaab's Law today, and configurable as requirements change.
Workflows, urgency rules, team assignment and time limits are all set to fit your organisation, so you can update them as the rules change.
Phase 2 readiness checklist
A short checklist to test whether your reporting, sorting by urgency and repairs processes are ready for the seven new hazard categories. Tell us where to send it.
Sources
- Awaab's Law Phase 2: guidance for social housing landlords (GOV.UK)
- Awaab's Law Phase 2: hazards guidance for social landlords (GOV.UK)
- Awaab's Law in the social rented sector (GOV.UK collection)
This page is a summary for information only and isn't legal advice. Last reviewed 10 November 2026.
